DeadSoxy inbox placement rebuild
Rebuilt the cold email infrastructure from scratch after placement remained near 40%, then verified the new sending environment before volume returned.
- 40% to 94%+placement
- 8.4%reply rate
- Fullinfrastructure rebuild
Verified Case Studies
These are real engagements across strategy, buyer data, deliverability, outbound, CRM automation, and booked-meeting workflows. Every result stays tied to the work that produced it.
No anonymous star ratings. No invented revenue figures. Source context stays with each engagement.
Case Library
Filter by the GTM layer you want to improve. Each case explains the operational problem, the work delivered, and the outcome that was observed.
Rebuilt the cold email infrastructure from scratch after placement remained near 40%, then verified the new sending environment before volume returned.
Rebuilt a degraded outreach setup across three domains and six inboxes after a single inbox fell from 35% opens to near zero.
Migrated an outbound program after 73,500 emails on the wrong platform produced 2.85% opens and spam complaints.
Built the Apollo, Clay, validation, and inbox infrastructure required for the first agency-acquisition campaign.
Audited a high-volume environment with security-scanner interference, 20+ domains, and an existing 500k monthly send volume.
Designed a sales workflow around reply behavior, qualification signals, suppression logic, re-engagement, and handoff ownership.
Recovered a B2B outbound system affected by broken SPF, mismatched DKIM, and blacklist issues before outreach volume resumed.
Moved an author and coaching operation into authenticated sending without disrupting live email or leaving a fragile handoff.
Evidence Standard
The GTM layer, constraints, and delivery work are named clearly.
Metrics stay attached to the platform data or observed placement result.
Cases show whether the client team can operate the system after delivery.
Your GTM System
We will map the constraint across positioning, buyer data, visibility, deliverability, outbound, and CRM workflow, then identify the first build that unlocks progress.
Book GTM Audit